Water plan house input
So in the previous chapter we showed you the income transport of different sources and the solution to create the
choice to transport it to the different places. Next we found out which parts uses water and what kind of quality it
uses. The next step is how these pipes are planned to reach these water-users.
Meaning color water pipe
Pantry
In the pantry the 3 types of water (waterworks, water tank and water pool) come into the house and will be
separated in 3 groups, Hot high quality, Cold high quality and Cold medium quality. The Hot high-pipe goes to the
boiler and when the water is heated it can be transported to the floor heat installation and to the washing machine
with a temperature regulation. Also a Cold high can be needed for the floor heat in case the temperature in and out
the house is to warm in the summer. I have to find out how that works.
Kitchen
In the kitchen there is Hot high and Cold high.
Bathroom
In the bathroom there is a WC also with Cold medium. The shower and a washbasin, both have Hot high and Cold
high.
Toilet
In the toilet there will be the toilet and a fountain.
Both are Cold medium.
Still we are thinking if there is a solution for an alternative such as a compost toilet. The same plays a role in the bathroom.
Solar collector
On the roof there are collectors with a Cold high input and and warmed up that will be transported to the boiler.
Garage
From the Toilet, a pipe is going to the garage with Cold medium.
Outside tap point
From the garage a pipe is going to am outside tap point with Cold medium.